Well Killing Methods (Wait and Weight Method)


Well Killing Methods (Wait and Weight Method)

Well control is important for Oil and Gas because it helps in maintaining operational integrity and prevents catastrophic accidents. This article explain various well killing Methods Restarting well killing Method (Engineers Method (i.e Wait and Weight) (Stepwise Procedure to kill the well effectively and avoid blowouts.

Overview of Methods Well Killing

Killing, however, is a critical procedure in the oil and gas industry where it is used to control and contain well kicks or blowouts. Watch out for well kicks which happen when formation fluids enter the wellbore inadvertently, often caused by pressure differentials, and can lead to blow outs if the influx isn't managed properly. A wide variety of well control methods are employed to avoid catastrophes, both for the safety of personnel and environmental protection.

The Engineer's Method (also called the Wait and Weight Method) is one of the most widely-used techniques in killing wells. The most commonly used mechanism to reduce casing pressure and reduce the risk of damaging the formation.

The Engineer’s Method — a method for wellbore pressure management using a controlled circulation of kill-weight mud to displace the influx and restore a balanced wellbore pressure. This method is a single circulation process with less mud volume displacement and improved pressure control.

1. Step-by-step process for Killing a Well

The first step is to detect and shut-in the well.

Upon detection of an overflow or well kick mitigation, the well will be shut-in per standard well control procedures. This step involves:

To isolate the well, close the blowout preventer (BOP)

Key parameters that are recorded include:

SIDPP -- Shut-in Drill Pipe Pressure

SICP (Shut-in Casing Pressure)

Monitor Changes in Active Mud Tank Volume

How to calculate required kill mud density to control well pressure

Step 2: Make Kill-Weight Mud

Based on this calculation, mix, and prepare kill-weight mud to the density needed to counter formation pressure.

It is important to mix well and that the fluid be homogeneous before circulating.

Step 3: Initiate Circulation

Here begins the process of the well kill pump at a controlled strokes per minute (SPM).

In drilling, gradually adjust the choke valve to hold the casing pressure (SICP).

The pressure measured at the drill pipe at this point is referred to as the Initial Circulating Pressure (ICP).

Stage 4: Kill Mud Pump and Pressure Control

This is achieved by slowly pumping the kill-weight mud down into the well while continuously adjusting the choke valve in drilling to ensure that the casing pressure stays constant.

As kill mud displaces formation fluid, the pressure at the drill pipe will gradually decrease from ICP to FCP.

Step 5: Keep Grill Standpipe Pressure Consistent

Key Activities Fine-tune the choke valve adjustment in drilling to stabilize standpipe pressure as kill-weight mud is circulated through the wellbore.

Keep pumping until the kill-weight mud returns to the surface via the choke manifold.

Step 6: Verify Well Stability

Check for balanced inflow and outflow densities once kill-weight mud returns to the surface.

Turn off the pump and shut the choke gate.

If casing pressure is non-zero, reopen the choke and circulate at FCP until casing pressure stabilizes.

Step 7: Validate Killing Operation Has Completed

Closed in Well Kill Pump and monitor all standpipe and casing pressure.

When both pressures are zero, the well control is confirmed successful.

BOP to be opened and normal drilling operations resumed.

Secondary kill operation (if necessary)

Step 8: The post Killing the Well Case A well kill pump is shut down when bottom-hole pressure drops to ∆P and no fluid influx is observed.

Repeat this process until full well control is established with a second round of killing circulation.

The Engineer’s Method advantages

Reduced Surface Pressure: Lessens the chances of high casing pressure that might lead to surface tool failure.

Intermittent Fluid Circulation: Promoting wellbore integrity and preventing the uncontrolled influx of formation fluids.

Lower Mud Volume Need: Only one circulation is used, optimizing mud volume.

Reduced risk of formation damage: There is a decreased risk of damaging the reservoir because the drilling fluids provide better pressure and temperature control.

Well Killing Operations: Things to Know

Correct Measurement: Only accurate measurement of SIDPP and SICP will help calculate kill mud density.

Bad Choke Management: Puncture Pressure and Choke Valve Adjustment in Drilling

Continuous Monitoring: Monitoring the pressure of the drill pipe and casing during the operation.

Preventive measures: The procedures of preventing such accidents are safe keeping of control of well in case of drilling, which helps prepare for blowouts.

Conclusion

The Engineer's Method (Wait and Weight Method) still the most effective and applied well control methods in the hydrocarbon sector. It establishes blowout prevention during drilling by displacing formation fluids with kill-weight mud, decreasing casing pressure, and re-establishing a stable wellbore environment. This method's performance hinges on accurate conducting & maintaining pressure in drilling and real-time monitoring of critical parameters, which are paramount to the success of well control operations.

These best practices can help drilling engineers and rig personnel prepare for and mitigate potential well control situations, achieving safe operations through well control, while assisting to drive operational efficiency in drilling.