Well control is important for Oil and Gas because it helps in maintaining operational integrity and prevents catastrophic accidents. This article explain various well killing Methods Restarting well killing Method (Engineers Method (i.e Wait and Weight) (Stepwise Procedure to kill the well effectively and avoid blowouts.
Overview of Methods Well Killing
Killing, however, is a critical
procedure in the oil and gas industry where it is used to control and contain
well kicks or blowouts. Watch out for well kicks which happen when formation
fluids enter the wellbore inadvertently, often caused by pressure
differentials, and can lead to blow outs if the influx isn't managed properly.
A wide variety of well control methods are employed to avoid catastrophes, both
for the safety of personnel and environmental protection.
The Engineer's Method (also called the
Wait and Weight Method) is one of the most widely-used techniques in killing
wells. The most commonly used mechanism to reduce casing pressure and reduce
the risk of damaging the formation.
The Engineer’s Method — a method for wellbore pressure management using a controlled circulation of kill-weight mud to displace the influx and restore a balanced wellbore pressure. This method is a single circulation process with less mud volume displacement and improved pressure control.
1. Step-by-step process for Killing
a Well
The first step is to detect and
shut-in the well.
Upon detection of an overflow or
well kick mitigation, the well will be shut-in per standard well control procedures.
This step involves:
To isolate the well, close the
blowout preventer (BOP)
Key parameters that are recorded
include:
SIDPP -- Shut-in Drill Pipe Pressure
SICP (Shut-in Casing Pressure)
Monitor Changes in Active Mud Tank
Volume
How to calculate required kill mud
density to control well pressure
Step 2: Make Kill-Weight Mud
Based on this calculation, mix, and
prepare kill-weight mud to the density needed to counter formation pressure.
It is important to mix well and that
the fluid be homogeneous before circulating.
Step 3: Initiate Circulation
Here begins the process of the well
kill pump at a controlled strokes per minute (SPM).
In drilling, gradually adjust the
choke valve to hold the casing pressure (SICP).
The pressure measured at the drill
pipe at this point is referred to as the Initial Circulating Pressure (ICP).
Stage 4: Kill Mud Pump and Pressure
Control
This is achieved by slowly pumping the
kill-weight mud down into the well while continuously adjusting the choke valve
in drilling to ensure that the casing pressure stays constant.
As kill mud displaces formation
fluid, the pressure at the drill pipe will gradually decrease from ICP to FCP.
Step 5: Keep Grill Standpipe
Pressure Consistent
Key Activities Fine-tune the choke
valve adjustment in drilling to stabilize standpipe pressure as kill-weight mud
is circulated through the wellbore.
Keep pumping until the kill-weight
mud returns to the surface via the choke manifold.
Step 6: Verify Well Stability
Check for balanced inflow and
outflow densities once kill-weight mud returns to the surface.
Turn off the pump and shut the choke
gate.
If casing pressure is non-zero,
reopen the choke and circulate at FCP until casing pressure stabilizes.
Step 7: Validate Killing Operation
Has Completed
Closed in Well Kill Pump and monitor all
standpipe and casing pressure.
When both pressures are zero, the
well control is confirmed successful.
BOP to be opened and normal drilling operations
resumed.
Secondary kill operation (if necessary)
Step 8: The post Killing the Well Case A well kill pump is shut down when bottom-hole pressure drops to ∆P and no fluid influx is observed.
Repeat this process until full well
control is established with a second round of killing circulation.
The Engineer’s Method advantages
Reduced Surface Pressure: Lessens
the chances of high casing pressure that might lead to surface tool failure.
Intermittent Fluid Circulation:
Promoting wellbore integrity and preventing the uncontrolled influx of
formation fluids.
Lower Mud Volume Need: Only one circulation
is used, optimizing mud volume.
Reduced risk of formation damage:
There is a decreased risk of damaging the reservoir because the drilling fluids
provide better pressure and temperature control.
Well Killing Operations: Things to
Know
Correct Measurement: Only accurate
measurement of SIDPP and SICP will help calculate kill mud density.
Bad Choke Management: Puncture
Pressure and Choke Valve Adjustment in Drilling
Continuous Monitoring: Monitoring
the pressure of the drill pipe and casing during the operation.
Preventive measures: The procedures of
preventing such accidents are safe keeping of control of well in case of
drilling, which helps prepare for blowouts.
Conclusion
The Engineer's Method (Wait and
Weight Method) still the most effective and applied well control methods in the
hydrocarbon sector. It establishes blowout prevention during drilling by displacing
formation fluids with kill-weight mud, decreasing casing pressure, and
re-establishing a stable wellbore environment. This method's performance hinges
on accurate conducting & maintaining pressure in drilling and real-time
monitoring of critical parameters, which are paramount to the success of well
control operations.
These best practices can help drilling engineers and rig personnel prepare for and mitigate potential well control situations, achieving safe operations through well control, while assisting to drive operational efficiency in drilling.
0 Comments